Basin study recommendations

MoEF&CC cumulative impact assessment recommendations, including dropping of projects and project-specific environmental flows, apply. Projects beyond those in the Basin Study report may not be allotted to a developer, as Forest Clearance or Environmental Clearance may not be granted.

Basin Studies and DPR Summaries

Comprehensive basin studies conducted by the Ministry of Environment, Forest and Climate Change (MoEF&CC) identify hydropower development potential across Arunachal Pradesh's seven major river basins.

Basin Studies Overview

BasinStudy YearProjects IdentifiedApproved ProjectsTotal CapacityStatus
KamengApril 201529 HEPs-1,282.70 MWCompleted
SubansiriApril 201629 HEPs-11,282.70 MWCompleted
Subansiri (Dikrong)April 201827 HEPs-1,116.5 MWCompleted
SiangMarch 201544 HEPs2918,293 MWCompleted
Dibang-Under assessment-SignificantOngoing
Lohit-Operational projects-SignificantOngoing
Tawang-Under assessment-SignificantOngoing

Detailed Basin Summaries

Kameng Basin

Basin Study: April 2015

Study Conducted By: Ministry of Environment, Forest and Climate Change

Projects Identified: 29 Hydroelectric Projects (HEPs)

Total Potential: 1,282.70 MW

Geographic Scope: Northwestern Arunachal Pradesh

Project Scale Distribution:

  • Large projects (> 100 MW): Multiple
  • Medium projects (25-100 MW): Several
  • Small projects (< 25 MW): Multiple

Development Status:

  • Several projects in feasibility stage
  • Tendering in progress for some projects
  • Environmental assessments underway
  • Land acquisition in process

Chief Engineer: Shri Moto Basar (9436011190)

Download Kameng Basin Study (PDF)

Subansiri Basin

Basin Study: April 2016

Study Conducted By: Ministry of Environment, Forest and Climate Change

Projects Identified: 29 Hydroelectric Projects (HEPs)

Total Potential: 11,282.70 MW

Geographic Scope: Central Arunachal Pradesh

Project Characteristics:

  • Mix of large storage and run-of-river projects
  • Strategic basin for overall development
  • Multiple developer interests
  • Complex environmental considerations

Development Status:

  • Environmental assessments in progress
  • Feasibility studies ongoing
  • Community consultations
  • Project-specific committees

Chief Engineer: Shri T.U Taba (7005893359)

Download Subansiri Basin Study (PDF)

Subansiri (Dikrong) Basin

Basin Study: April 2018

Study Conducted By: Ministry of Environment, Forest and Climate Change

Projects Identified: 27 Hydroelectric Projects (HEPs)

Total Potential: 1,116.5 MW

Geographic Scope: Subansiri region (Dikrong tributary)

Basin Characteristics:

  • Separate assessment from main Subansiri Basin
  • Distinct hydrological characteristics
  • Lower capacity but high strategic value
  • Sensitive environmental zones

Development Status:

  • Feasibility studies in early stages
  • Environmental screening ongoing
  • Multi-stakeholder coordination
  • Long-term development pipeline

Chief Engineer: Shri T.U Taba (7005893359)

Download Subansiri Dikrong Basin Study (PDF)

Siang Basin

Basin Study: March 2015

Study Conducted By: Ministry of Environment, Forest and Climate Change

Total Projects Identified: 44 Hydroelectric Projects (HEPs)

Projects Status:

  • Approved for Development: 29 HEPs
  • Dropped/Deferred: 15 HEPs

Total Potential: 18,293 MW

Basin Significance: Largest single hydropower basin in Arunachal Pradesh

Project Scale:

  • Largest Project: Siang Upper Stage-II (3,750 MW)
  • Multiple projects above 1,000 MW capacity
  • Range from 100 MW to 3,750 MW
  • Mix of storage and run-of-river

Strategic Projects:

  • Siang Upper Stage-II: 3,750 MW
  • Major storage projects for water management
  • Flood moderation benefits
  • Multi-purpose development

Development Status:

  • Multiple projects in implementation
  • Environmental clearances progressing
  • Infrastructure development underway
  • Community engagement ongoing

Chief Engineer: Shri Karom Perme (9436040184) Email: hpdmonitoring-arn[at]nic[dot]in

Download Siang Basin Study (PDF)

Dibang Basin

Basin Status: Assessment ongoing

Hydropower Potential: Significant untapped resources

Geographic Scope: Eastern Arunachal Pradesh

Development Stage: Preliminary investigation

Future Plans: Comprehensive basin study planned

Chief Engineer: Shri Along Ketan (9436059399)

Download Dibang Basin Study (PDF)

Lohit Basin

Basin Status: Operational projects present

Hydropower Potential: Significant

Geographic Scope: Southeastern Arunachal Pradesh

Development Stage: Projects under construction and operation

Ongoing Projects: Multiple projects in various stages

Chief Engineer: Shri Along Ketan (9436059399)

Download Lohit Basin Study (PDF)

Tawang Basin

Basin Status: Strategic basin under assessment

Hydropower Potential: Significant

Geographic Scope: Northern Arunachal Pradesh

Development Stage: Early-stage exploration

Future Plans: Development strategy being formulated

Chief Engineer: Shri Along Ketan (9436059399)

Download Tawang Basin Study (PDF)

Key Findings from Basin Studies

Environmental Sensitivity

Basin studies identified:

  • Biodiversity hotspots requiring protection
  • Sensitive ecological areas
  • Conservation zones
  • Wildlife corridors
  • Forest cover requirements

Social Considerations

  • Tribal populations in project areas
  • Customary land rights
  • Traditional livelihood patterns
  • Resettlement requirements
  • Community consultation needs

Technical Feasibility

  • Hydrological assessments
  • Geological surveys
  • Power generation potential
  • Design standards
  • Construction feasibility

Prioritization Framework

Basin studies recommended project prioritization based on:

  • Environmental sensitivity
  • Social impact management capacity
  • Technical viability
  • Developer readiness
  • Strategic importance

Project Approval Process

Basin Study Recommendations

Basin studies identify projects as:

  • Recommended for Development: Subject to clearances
  • Conditional Approval: With specific conditions
  • Dropped/Deferred: Due to environmental or social concerns

Post-Study Process

  1. Project Notification: Approved projects formally notified
  2. Concession Opening: Projects opened for bidding
  3. Developer Selection: Through competitive process
  4. Feasibility Stage: Detailed studies by developer
  5. Environmental Clearance: MoEF&CC clearance obtained
  6. Forest Clearance: Forest Department approval
  7. Construction Start: After all clearances

Using Basin Study Information

For Developers

  • Project identification and evaluation
  • Capacity assessment
  • Environmental requirement understanding
  • Community engagement planning
  • Feasibility study foundation

For Communities

  • Information on potential projects
  • Impact understanding
  • Benefit identification
  • Participation opportunities
  • Rights and protections

For Government

  • Policy formulation
  • Strategic planning
  • Resource allocation
  • Monitoring framework
  • Performance assessment

Contact for Basin Study Information

Chief Engineer (Basin-specific):

  • Kameng: Shri Moto Basar (9436011190)
  • Subansiri: Shri T.U Taba (7005893359)
  • Siang: Shri Karom Perme (9436040184)
  • Dibang, Lohit, Tawang: Shri Along Ketan (9436059399)

Commissioner, DHPD Email: commrdhpd[dot]arn[at]gmail[dot]com Phone: 8731931119 (PIO)